REPLACEMENT OF A PART OF THE CIP UNIT, FROM THE CLIENT
Manufacture and installation of two isothermal vertical deposits, with 11m³ and 12m³ capacity.
Installation of all interconnection tabulating the production unit.
REPLACEMENT OF A PART OF THE CIP UNIT, FROM THE CLIENT